US Bridges

Barker RD over RR

Good

Spokane County, Washington · .4 N Garland Ave · Structure no. 0019623A0000000

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
238 ft
3 main spans
Daily traffic
8,422
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Barker RD over RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Barker RD over RR in Spokane County, Washington. It was built in 2022, so it is 3 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,422 vehicles a day, roughly 16% of them trucks. The structure is 238 ft (72.6 m) long and 49 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBarker RD
CrossesRR
Location.4 N Garland Ave
RouteCity Street 0
Coordinates47.69861, -117.15478
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length238 ft (72.6 m)
Longest span121 ft (36.9 m)
Deck width49 ft (14.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,422 (2023)
Projected traffic—
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Barker RD over RR built?

It was built in 2022, making it 3 years old in 2025.

What condition is Barker RD over RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Barker RD over RR carry?

About 8,422 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is Barker RD over RR?

The structure is 238 ft (72.6 m) long with a longest span of 121 ft (36.9 m) and a deck 49 ft wide.

Who owns Barker RD over RR?

It is owned by the City or Municipal Highway Agency.