NB US 395 over Parksmith DR & RR
GoodSpokane County, Washington · 7.3 N JCT I-90 · Structure no. 0017177C0000000
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 276 ft
- 2 main spans
- Daily traffic
- 5,839
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NB US 395 over Parksmith DR & RR is a prestressed concrete continuous stringer/multi-beam or girder carrying NB US 395 over Parksmith DR & RR in Spokane County, Washington. It was built in 2009, so it is 16 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,839 vehicles a day, roughly 8% of them trucks, projected to reach 8,311 by 2039. The structure is 276 ft (84.1 m) long and 107 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB US 395 over Parksmith DR & RR built?
It was built in 2009, making it 16 years old in 2025.
What condition is NB US 395 over Parksmith DR & RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does NB US 395 over Parksmith DR & RR carry?
About 5,839 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is NB US 395 over Parksmith DR & RR?
The structure is 276 ft (84.1 m) long with a longest span of 133 ft (40.5 m) and a deck 107 ft wide.
Who owns NB US 395 over Parksmith DR & RR?
It is owned by the State Highway Agency.