State Avenue over Quilceda Creek
GoodSnohomish County, Washington · 1.2 NE JCT I-5 · Structure no. 089309000000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 101 ft
- 1 main span
- Daily traffic
- 16,432
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
State Avenue over Quilceda Creek is a prestressed concrete stringer/multi-beam or girder carrying State Avenue over Quilceda Creek in Snohomish County, Washington. It was built in 2022, so it is 3 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,432 vehicles a day, roughly 8% of them trucks, projected to reach 22,000 by 2044. The structure is 101 ft (30.9 m) long and 69 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Avenue over Quilceda Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is State Avenue over Quilceda Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does State Avenue over Quilceda Creek carry?
About 16,432 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is State Avenue over Quilceda Creek?
The structure is 101 ft (30.9 m) long with a longest span of 97 ft (29.5 m) and a deck 69 ft wide.
Who owns State Avenue over Quilceda Creek?
It is owned by the City or Municipal Highway Agency.