US Bridges

Van RY Blvd over Mcaleer Creek

FairPosted for load

Snohomish County, Washington · 0.2 NW 244th ST SW · Structure no. 089130000000000

Built
1990
35 years old, rebuilt 2018
Condition
Fair
inspected October 2023
Type
Tee Beam
Concrete
Length
32 ft
1 main span
Daily traffic
1,000
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Van RY Blvd over Mcaleer Creek is a concrete tee beam carrying Van RY Blvd over Mcaleer Creek in Snohomish County, Washington. It was built in 1990 and reconstructed in 2018, so it is 35 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 2,000 by 2045. The structure is 32 ft (9.7 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesVan RY Blvd
CrossesMcaleer Creek
Location0.2 NW 244th ST SW
RouteCity Street 815
Coordinates47.78, -122.31433
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating32 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length32 ft (9.7 m)
Longest span30 ft (9.1 m)
Deck width46 ft (14 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2020)
Projected traffic2,000 by 2045
Trucks2%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Van RY Blvd over Mcaleer Creek built?

It was built in 1990, making it 35 years old in 2025. It was reconstructed in 2018.

What condition is Van RY Blvd over Mcaleer Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Van RY Blvd over Mcaleer Creek carry?

About 1,000 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is Van RY Blvd over Mcaleer Creek?

The structure is 32 ft (9.7 m) long with a longest span of 30 ft (9.1 m) and a deck 46 ft wide.

Who owns Van RY Blvd over Mcaleer Creek?

It is owned by the City or Municipal Highway Agency.