US Bridges

342nd DR NE over S.F. Stillaguamish River

Good

Snohomish County, Washington · 12.0 E JCT SR 92 · Structure no. 088042000000000

Built
2009
16 years old
Condition
Good
inspected June 2024
Type
Truss - Thru
Steel
Length
249 ft
2 main spans
Daily traffic
44
2018 count
Owner
County
County Highway Agency

About this bridge

342nd DR NE over S.F. Stillaguamish River is a steel truss - thru carrying 342nd DR NE over S.F. Stillaguamish River in Snohomish County, Washington. It was built in 2009, so it is 16 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 44 vehicles a day, roughly 1% of them trucks, projected to reach 31 by 2040. The structure is 249 ft (75.9 m) long and 13 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

Carries342nd DR NE
CrossesS.F. Stillaguamish River
Location12.0 E JCT SR 92
RouteCounty Highway 87570
Coordinates48.08636, -121.772
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.1 US tons
Inventory rating28.5 US tons

Structure

Structure typeTruss - Thru
MaterialSteel
DeckWood or timber
Main spans2
Design loadHL 93
Structure length249 ft (75.9 m)
Longest span149 ft (45.4 m)
Deck width13 ft (3.9 m)
Roadway width12 ft (3.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic44 (2018)
Projected traffic31 by 2040
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$6.4 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 342nd DR NE over S.F. Stillaguamish River built?

It was built in 2009, making it 16 years old in 2025.

What condition is 342nd DR NE over S.F. Stillaguamish River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does 342nd DR NE over S.F. Stillaguamish River carry?

About 44 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is 342nd DR NE over S.F. Stillaguamish River?

The structure is 249 ft (75.9 m) long with a longest span of 149 ft (45.4 m) and a deck 13 ft wide.

Who owns 342nd DR NE over S.F. Stillaguamish River?

It is owned by the County Highway Agency.