US Bridges

Lundeen Park Way over Trib Weiser CR

Fair

Snohomish County, Washington · 0.1 N JCT SR204 · Structure no. 087239000000000

Built
2005
20 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
221 ft
1 main span
Daily traffic
4,115
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lundeen Park Way over Trib Weiser CR is a steel stringer/multi-beam or girder carrying Lundeen Park Way over Trib Weiser CR in Snohomish County, Washington. It was built in 2005, so it is 20 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,115 vehicles a day, roughly 5% of them trucks, projected to reach 15,000 by 2045. The structure is 221 ft (67.5 m) long and 51 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLundeen Park Way
CrossesTrib Weiser CR
Location0.1 N JCT SR204
RouteCity Street 94770
Coordinates48.00345, -122.117
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating100 US tons
Inventory rating60 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 25 or greater
Structure length221 ft (67.5 m)
Longest span171 ft (52.1 m)
Deck width51 ft (15.5 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,115 (2019)
Projected traffic15,000 by 2045
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$4 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Lundeen Park Way over Trib Weiser CR built?

It was built in 2005, making it 20 years old in 2025.

What condition is Lundeen Park Way over Trib Weiser CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Lundeen Park Way over Trib Weiser CR carry?

About 4,115 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Lundeen Park Way over Trib Weiser CR?

The structure is 221 ft (67.5 m) long with a longest span of 171 ft (52.1 m) and a deck 51 ft wide.

Who owns Lundeen Park Way over Trib Weiser CR?

It is owned by the City or Municipal Highway Agency and maintained by the County Highway Agency.