Rd. No. 23 over Stujack Creek
GoodSnohomish County, Washington · M.P. 3.5 Rd. No. 23 · Structure no. 060502000016318
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 81 ft
- 1 main span
- Daily traffic
- 50
- Owner
- Federal
- U.S. Forest Service
About this bridge
Rd. No. 23 over Stujack Creek is a steel stringer/multi-beam or girder carrying Rd. No. 23 over Stujack Creek in Snohomish County, Washington. It was built in 2011, so it is 14 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 81 ft (24.8 m) long and 16 ft wide. If it were closed, the detour would be 44.7 mi (72 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rd. No. 23 over Stujack Creek built?
It was built in 2011, making it 14 years old in 2025.
What condition is Rd. No. 23 over Stujack Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Rd. No. 23 over Stujack Creek carry?
About 50 vehicles per day (latest count).
How long is Rd. No. 23 over Stujack Creek?
The structure is 81 ft (24.8 m) long with a longest span of 77 ft (23.5 m) and a deck 16 ft wide.
Who owns Rd. No. 23 over Stujack Creek?
It is owned by the U.S. Forest Service.