I-5 over Ebey Sl / SR 529 / RR
FairSnohomish County, Washington · 4.7 N JCT US 2 · Structure no. 0004196A0000000
- Built
- 1954
- 71 years old, rebuilt 1968
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,920 ft
- 3 main spans
- Daily traffic
- 64,989
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-5 over Ebey Sl / SR 529 / RR is a steel continuous stringer/multi-beam or girder carrying I-5 over Ebey Sl / SR 529 / RR in Snohomish County, Washington. It was built in 1954 and reconstructed in 1968, so it is 71 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 64,989 vehicles a day, roughly 6% of them trucks, projected to reach 95,649 by 2039. The structure is 1,920 ft (585.2 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-5 over Ebey Sl / SR 529 / RR built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1968.
What condition is I-5 over Ebey Sl / SR 529 / RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does I-5 over Ebey Sl / SR 529 / RR carry?
About 64,989 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is I-5 over Ebey Sl / SR 529 / RR?
The structure is 1,920 ft (585.2 m) long with a longest span of 124 ft (37.8 m) and a deck 65 ft wide.
Who owns I-5 over Ebey Sl / SR 529 / RR?
It is owned by the State Highway Agency.