US Bridges

Beaver Pond DR S over Gc Creek

Good

Skagit County, Washington · 0.5 N JCT Eaglemont DR · Structure no. 087591000000000

Built
2004
21 years old
Condition
Good
inspected October 2023
Type
Slab
Prestressed Concrete
Length
30 ft
1 main span
Daily traffic
200
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Beaver Pond DR S over Gc Creek is a prestressed concrete slab carrying Beaver Pond DR S over Gc Creek in Skagit County, Washington. It was built in 2004, so it is 21 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 240 by 2043. The structure is 30 ft (9.1 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBeaver Pond DR S
CrossesGc Creek
Location0.5 N JCT Eaglemont DR
RouteCity Street 820
Coordinates48.41039, -122.27464
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.2 US tons
Inventory rating46.1 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length30 ft (9.1 m)
Longest span29 ft (8.9 m)
Deck width36 ft (11 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2019)
Projected traffic240 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$428,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Beaver Pond DR S over Gc Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is Beaver Pond DR S over Gc Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Beaver Pond DR S over Gc Creek carry?

About 200 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Beaver Pond DR S over Gc Creek?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.9 m) and a deck 36 ft wide.

Who owns Beaver Pond DR S over Gc Creek?

It is owned by the City or Municipal Highway Agency.