US Bridges

Pioneer HWY over Big Ditch

Good

Skagit County, Washington · 0.23 E JCT Milltown Road · Structure no. 0013135B0000000

Built
1987
38 years old
Condition
Good
inspected July 2024
Type
Slab
Prestressed Concrete Continuous
Length
81 ft
2 main spans
Daily traffic
9,442
2021 count
Owner
County
County Highway Agency

About this bridge

Pioneer HWY over Big Ditch is a prestressed concrete continuous slab carrying Pioneer HWY over Big Ditch in Skagit County, Washington. It was built in 1987, so it is 38 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,442 vehicles a day, roughly 9% of them trucks, projected to reach 17,053 by 2041. The structure is 81 ft (24.7 m) long and 40 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPioneer HWY
CrossesBig Ditch
Location0.23 E JCT Milltown Road
RouteCounty Highway 80090
Coordinates48.3051, -122.34983
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96 US tons
Inventory rating57 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete Continuous
DeckOther
Main spans2
Design loadHS 20 + Mod
Structure length81 ft (24.7 m)
Longest span40 ft (12.2 m)
Deck width40 ft (12.3 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,442 (2021)
Projected traffic17,053 by 2041
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$3.3 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Pioneer HWY over Big Ditch built?

It was built in 1987, making it 38 years old in 2025.

What condition is Pioneer HWY over Big Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Pioneer HWY over Big Ditch carry?

About 9,442 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is Pioneer HWY over Big Ditch?

The structure is 81 ft (24.7 m) long with a longest span of 40 ft (12.2 m) and a deck 40 ft wide.

Who owns Pioneer HWY over Big Ditch?

It is owned by the County Highway Agency.