US Bridges

I-5 over Gages Slough

Good

Skagit County, Washington · 1.7 N JCT SR 538 · Structure no. 0004795C0000000

Built
1954
71 years old, rebuilt 1973
Condition
Good
inspected March 2023
Type
Slab
Concrete Continuous
Length
104 ft
5 main spans
Daily traffic
32,965
2023 count
Owner
State
State Highway Agency

About this bridge

I-5 over Gages Slough is a concrete continuous slab carrying I-5 over Gages Slough in Skagit County, Washington. It was built in 1954 and reconstructed in 1973, so it is 71 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 32,965 vehicles a day, roughly 10% of them trucks, projected to reach 48,817 by 2039. The structure is 104 ft (31.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-5
CrossesGages Slough
Location1.7 N JCT SR 538
RouteInterstate 5
Coordinates48.45881, -122.34161
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.1 US tons
Inventory rating32.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length104 ft (31.7 m)
Longest span22 ft (6.7 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic32,965 (2023)
Projected traffic48,817 by 2039
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was I-5 over Gages Slough built?

It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1973.

What condition is I-5 over Gages Slough in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does I-5 over Gages Slough carry?

About 32,965 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is I-5 over Gages Slough?

The structure is 104 ft (31.7 m) long with a longest span of 22 ft (6.7 m) and a deck 41 ft wide.

Who owns I-5 over Gages Slough?

It is owned by the State Highway Agency.