Tac Spur-Stadium N over Schuster Parkway
FairPierce County, Washington · 1.0 N JCT SR 509 · Structure no. 088854000000000
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 902 ft
- 10 main spans
- Daily traffic
- 11,151
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Tac Spur-Stadium N over Schuster Parkway is a prestressed concrete stringer/multi-beam or girder carrying Tac Spur-Stadium N over Schuster Parkway in Pierce County, Washington. It was built in 1974, so it is 51 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,151 vehicles a day, roughly 5% of them trucks, projected to reach 14,800 by 2042. The structure is 902 ft (274.9 m) long and 23 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tac Spur-Stadium N over Schuster Parkway built?
It was built in 1974, making it 51 years old in 2025.
What condition is Tac Spur-Stadium N over Schuster Parkway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Tac Spur-Stadium N over Schuster Parkway carry?
About 11,151 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Tac Spur-Stadium N over Schuster Parkway?
The structure is 902 ft (274.9 m) long with a longest span of 118 ft (36 m) and a deck 23 ft wide.
Who owns Tac Spur-Stadium N over Schuster Parkway?
It is owned by the City or Municipal Highway Agency.