East 23rd Street over City Waterway- Dock to D
FairPierce County, Washington · 01.0 No. JCT I-5 · Structure no. 085023000000000
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected July 2024
- Type
- Girder and Floorbeam System
- Prestressed Concrete
- Length
- 315 ft
- 3 main spans
- Daily traffic
- 2,000
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
East 23rd Street over City Waterway- Dock to D is a prestressed concrete girder and floorbeam system carrying East 23rd Street over City Waterway- Dock to D in Pierce County, Washington. It was built in 1983, so it is 42 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,000 vehicles a day, roughly 1% of them trucks, projected to reach 2,922 by 2044. The structure is 315 ft (96 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was East 23rd Street over City Waterway- Dock to D built?
It was built in 1983, making it 42 years old in 2025.
What condition is East 23rd Street over City Waterway- Dock to D in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does East 23rd Street over City Waterway- Dock to D carry?
About 2,000 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is East 23rd Street over City Waterway- Dock to D?
The structure is 315 ft (96 m) long with a longest span of 105 ft (32 m) and a deck 39 ft wide.
Who owns East 23rd Street over City Waterway- Dock to D?
It is owned by the City or Municipal Highway Agency.