SR 16 over Future Hov Lanes
GoodPierce County, Washington · JCT I-5 · Structure no. 0018189A0000000
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 282 ft
- 2 main spans
- Daily traffic
- 46,602
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 16 over Future Hov Lanes is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 16 over Future Hov Lanes in Pierce County, Washington. It was built in 2014, so it is 11 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 46,602 vehicles a day, roughly 5% of them trucks, projected to reach 63,839 by 2039. The structure is 282 ft (86 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 16 over Future Hov Lanes built?
It was built in 2014, making it 11 years old in 2025.
What condition is SR 16 over Future Hov Lanes in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does SR 16 over Future Hov Lanes carry?
About 46,602 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is SR 16 over Future Hov Lanes?
The structure is 282 ft (86 m) long with a longest span of 140 ft (42.7 m) and a deck 58 ft wide.
Who owns SR 16 over Future Hov Lanes?
It is owned by the State Highway Agency.