US Bridges

I-5 over Nisqually Overflow

Fair

Pierce County, Washington · 0.6 N Thurston CO · Structure no. 0012137B0000000

Built
1983
42 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
400 ft
4 main spans
Daily traffic
62,815
2023 count
Owner
State
State Highway Agency

About this bridge

I-5 over Nisqually Overflow is a prestressed concrete continuous stringer/multi-beam or girder carrying I-5 over Nisqually Overflow in Pierce County, Washington. It was built in 1983, so it is 42 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 62,815 vehicles a day, roughly 12% of them trucks, projected to reach 90,182 by 2039. The structure is 400 ft (121.9 m) long and 55 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesI-5
CrossesNisqually Overflow
Location0.6 N Thurston CO
RouteInterstate 5
Coordinates47.07511, -122.69497
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.3 US tons
Inventory rating35.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length400 ft (121.9 m)
Longest span100 ft (30.5 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic62,815 (2023)
Projected traffic90,182 by 2039
Trucks12%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$10.3 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was I-5 over Nisqually Overflow built?

It was built in 1983, making it 42 years old in 2025.

What condition is I-5 over Nisqually Overflow in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does I-5 over Nisqually Overflow carry?

About 62,815 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is I-5 over Nisqually Overflow?

The structure is 400 ft (121.9 m) long with a longest span of 100 ft (30.5 m) and a deck 55 ft wide.

Who owns I-5 over Nisqually Overflow?

It is owned by the State Highway Agency.