US Bridges

SR 105 over North River

Good

Pacific County, Washington · 10.5 N JCT US 101 · Structure no. 0018345B0000000

Built
2014
11 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
600 ft
4 main spans
Daily traffic
1,099
2023 count
Owner
State
State Highway Agency

About this bridge

SR 105 over North River is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 105 over North River in Pacific County, Washington. It was built in 2014, so it is 11 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,099 vehicles a day, roughly 12% of them trucks, projected to reach 1,302 by 2039. The structure is 600 ft (182.9 m) long and 39 ft wide. If it were closed, the detour would be 70.8 mi (114 km).

CarriesSR 105
CrossesNorth River
Location10.5 N JCT US 101
RouteState Highway 105
Coordinates46.75118, -123.88647
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length600 ft (182.9 m)
Longest span160 ft (48.8 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,099 (2023)
Projected traffic1,302 by 2039
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed70.8 mi (114 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$10.8 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 105 over North River built?

It was built in 2014, making it 11 years old in 2025.

What condition is SR 105 over North River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SR 105 over North River carry?

About 1,099 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is SR 105 over North River?

The structure is 600 ft (182.9 m) long with a longest span of 160 ft (48.8 m) and a deck 39 ft wide.

Who owns SR 105 over North River?

It is owned by the State Highway Agency.