Pe Ell Mcdonald RD over Stillman Creek
FairLewis County, Washington · 0.7 W JCT 92004 · Structure no. 081799000000000
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 180 ft
- 3 main spans
- Daily traffic
- 235
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Pe Ell Mcdonald RD over Stillman Creek is a concrete continuous box beam or girders - multiple carrying Pe Ell Mcdonald RD over Stillman Creek in Lewis County, Washington. It was built in 1959, so it is 66 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 235 vehicles a day, roughly 35% of them trucks, projected to reach 425 by 2042. The structure is 180 ft (54.9 m) long and 27 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pe Ell Mcdonald RD over Stillman Creek built?
It was built in 1959, making it 66 years old in 2025.
What condition is Pe Ell Mcdonald RD over Stillman Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Pe Ell Mcdonald RD over Stillman Creek carry?
About 235 vehicles per day (2022 count), of which roughly 35% are trucks.
How long is Pe Ell Mcdonald RD over Stillman Creek?
The structure is 180 ft (54.9 m) long with a longest span of 90 ft (27.4 m) and a deck 27 ft wide.
Who owns Pe Ell Mcdonald RD over Stillman Creek?
It is owned by the County Highway Agency.