University Way over Currier Creek
FairPosted for loadKittitas County, Washington · .40 W Dry CR Conn · Structure no. 085596000000000
- Built
- 1966
- 59 years old, rebuilt 1990
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 82 ft
- 3 main spans
- Daily traffic
- 7,845
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
University Way over Currier Creek is a concrete continuous slab carrying University Way over Currier Creek in Kittitas County, Washington. It was built in 1966 and reconstructed in 1990, so it is 59 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,845 vehicles a day, roughly 20% of them trucks, projected to reach 11,658 by 2039. The structure is 82 ft (25 m) long and 53 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was University Way over Currier Creek built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1990.
What condition is University Way over Currier Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does University Way over Currier Creek carry?
About 7,845 vehicles per day (2019 count), of which roughly 20% are trucks.
How long is University Way over Currier Creek?
The structure is 82 ft (25 m) long with a longest span of 34 ft (10.4 m) and a deck 53 ft wide.
Who owns University Way over Currier Creek?
It is owned by the City or Municipal Highway Agency.