US Bridges

US 97 over Swauk Creek

Good

Kittitas County, Washington · 10.1 N JCT SR 970 · Structure no. 0019323A0000000

Built
2021
4 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
5,941
2023 count
Owner
State
State Highway Agency

About this bridge

US 97 over Swauk Creek is a prestressed concrete stringer/multi-beam or girder carrying US 97 over Swauk Creek in Kittitas County, Washington. It was built in 2021, so it is 4 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,941 vehicles a day, roughly 22% of them trucks, projected to reach 8,532 by 2038. The structure is 100 ft (30.5 m) long and 39 ft wide.

CarriesUS 97
CrossesSwauk Creek
Location10.1 N JCT SR 970
RouteU.S. Route 97
Coordinates47.3276, -120.6645
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating37.1 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span94 ft (28.7 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,941 (2023)
Projected traffic8,532 by 2038
Trucks22%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$1.8 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 97 over Swauk Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is US 97 over Swauk Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does US 97 over Swauk Creek carry?

About 5,941 vehicles per day (2023 count), of which roughly 22% are trucks.

How long is US 97 over Swauk Creek?

The structure is 100 ft (30.5 m) long with a longest span of 94 ft (28.7 m) and a deck 39 ft wide.

Who owns US 97 over Swauk Creek?

It is owned by the State Highway Agency.