I-90 over Avalanche Relief
GoodKittitas County, Washington · 3.3 E JCT SR 906 · Structure no. 0018127A0000000
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 1,206 ft
- 8 main spans
- Daily traffic
- 18,069
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-90 over Avalanche Relief is a prestressed concrete continuous stringer/multi-beam or girder carrying I-90 over Avalanche Relief in Kittitas County, Washington. It was built in 2016, so it is 9 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,069 vehicles a day, roughly 21% of them trucks, projected to reach 22,265 by 2039. The structure is 1,206 ft (367.6 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-90 over Avalanche Relief built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-90 over Avalanche Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does I-90 over Avalanche Relief carry?
About 18,069 vehicles per day (2023 count), of which roughly 21% are trucks.
How long is I-90 over Avalanche Relief?
The structure is 1,206 ft (367.6 m) long with a longest span of 170 ft (51.8 m) and a deck 59 ft wide.
Who owns I-90 over Avalanche Relief?
It is owned by the State Highway Agency.