US Bridges

I-90 over Gold Creek

Good

Kittitas County, Washington · 0.7 E JCT SR 906 · Structure no. 0017852D0000000

Built
2012
13 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
930 ft
6 main spans
Daily traffic
18,069
2023 count
Owner
State
State Highway Agency

About this bridge

I-90 over Gold Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying I-90 over Gold Creek in Kittitas County, Washington. It was built in 2012, so it is 13 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,069 vehicles a day, roughly 21% of them trucks, projected to reach 22,265 by 2039. The structure is 930 ft (283.5 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-90
CrossesGold Creek
Location0.7 E JCT SR 906
RouteInterstate 90
Coordinates47.39163, -121.38524
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.3 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length930 ft (283.5 m)
Longest span155 ft (47.2 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,069 (2023)
Projected traffic22,265 by 2039
Trucks21%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$25.6 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was I-90 over Gold Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is I-90 over Gold Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-90 over Gold Creek carry?

About 18,069 vehicles per day (2023 count), of which roughly 21% are trucks.

How long is I-90 over Gold Creek?

The structure is 930 ft (283.5 m) long with a longest span of 155 ft (47.2 m) and a deck 59 ft wide.

Who owns I-90 over Gold Creek?

It is owned by the State Highway Agency.