I-90 over Highline Canal
FairKittitas County, Washington · 4.8 E JCT SR 970 · Structure no. 0007574C0000000
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 178 ft
- 2 main spans
- Daily traffic
- 14,717
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-90 over Highline Canal is a prestressed concrete stringer/multi-beam or girder carrying I-90 over Highline Canal in Kittitas County, Washington. It was built in 1965, so it is 60 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,717 vehicles a day, roughly 23% of them trucks, projected to reach 18,248 by 2039. The structure is 178 ft (54.3 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-90 over Highline Canal built?
It was built in 1965, making it 60 years old in 2025.
What condition is I-90 over Highline Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-90 over Highline Canal carry?
About 14,717 vehicles per day (2023 count), of which roughly 23% are trucks.
How long is I-90 over Highline Canal?
The structure is 178 ft (54.3 m) long with a longest span of 104 ft (31.7 m) and a deck 40 ft wide.
Who owns I-90 over Highline Canal?
It is owned by the State Highway Agency.