US Bridges

NW Taylor Road over Dickerson Creek

Good

Kitsap County, Washington · 0.02 W Northlake Way · Structure no. 088926000000000

Built
2016
9 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
25 ft
1 main span
Daily traffic
277
2023 count
Owner
County
County Highway Agency

About this bridge

NW Taylor Road over Dickerson Creek is a concrete culvert carrying NW Taylor Road over Dickerson Creek in Kitsap County, Washington. It was built in 2016, so it is 9 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 277 vehicles a day, roughly 7% of them trucks, projected to reach 257 by 2042. The structure is 25 ft (7.6 m) long and 51 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesNW Taylor Road
CrossesDickerson Creek
Location0.02 W Northlake Way
RouteCounty Highway 19000
Coordinates47.586, -122.71486
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating45.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width51 ft (15.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic277 (2023)
Projected traffic257 by 2042
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$273,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was NW Taylor Road over Dickerson Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is NW Taylor Road over Dickerson Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does NW Taylor Road over Dickerson Creek carry?

About 277 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is NW Taylor Road over Dickerson Creek?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m) and a deck 51 ft wide.

Who owns NW Taylor Road over Dickerson Creek?

It is owned by the County Highway Agency.