Clear Creek Road over Trigger Ave
GoodKitsap County, Washington · .1 Mile West of SR3 · Structure no. 086066000000000
- Built
- 1979
- 46 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 141 ft
- 1 main span
- Daily traffic
- 3,705
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Clear Creek Road over Trigger Ave is a prestressed concrete stringer/multi-beam or girder carrying Clear Creek Road over Trigger Ave in Kitsap County, Washington. It was built in 1979, so it is 46 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,705 vehicles a day, roughly 16% of them trucks, projected to reach 4,076 by 2043. The structure is 141 ft (43 m) long and 41 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clear Creek Road over Trigger Ave built?
It was built in 1979, making it 46 years old in 2025.
What condition is Clear Creek Road over Trigger Ave in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Clear Creek Road over Trigger Ave carry?
About 3,705 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is Clear Creek Road over Trigger Ave?
The structure is 141 ft (43 m) long with a longest span of 136 ft (41.5 m) and a deck 41 ft wide.
Who owns Clear Creek Road over Trigger Ave?
It is owned by the County Highway Agency.