Elliott Way Pl over Railroad Alleyway
GoodKing County, Washington · Elliot Way Pl and Pine ST · Structure no. 089402000000000
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected April 2023
- Type
- Girder and Floorbeam System
- Concrete
- Length
- 496 ft
- 2 main spans
- Daily traffic
- 2,000
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Elliott Way Pl over Railroad Alleyway is a concrete girder and floorbeam system carrying Elliott Way Pl over Railroad Alleyway in King County, Washington. It was built in 2023, so it is 2 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,830 by 2043. The structure is 496 ft (151.2 m) long and 79 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Elliott Way Pl over Railroad Alleyway built?
It was built in 2023, making it 2 years old in 2025.
What condition is Elliott Way Pl over Railroad Alleyway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Elliott Way Pl over Railroad Alleyway carry?
About 2,000 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Elliott Way Pl over Railroad Alleyway?
The structure is 496 ft (151.2 m) long with a longest span of 136 ft (41.5 m) and a deck 79 ft wide.
Who owns Elliott Way Pl over Railroad Alleyway?
It is owned by the City or Municipal Highway Agency.