S 116th ST over Drainage Ditch-Relief
GoodKing County, Washington · 0.3 MI W of SR-99 · Structure no. 089193000000000
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 175 ft
- 1 main span
- Daily traffic
- 6,500
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S 116th ST over Drainage Ditch-Relief is a concrete stringer/multi-beam or girder carrying S 116th ST over Drainage Ditch-Relief in King County, Washington. It was built in 2020, so it is 5 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,500 vehicles a day, roughly 5% of them trucks, projected to reach 7,200 by 2041. The structure is 175 ft (53.3 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S 116th ST over Drainage Ditch-Relief built?
It was built in 2020, making it 5 years old in 2025.
What condition is S 116th ST over Drainage Ditch-Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does S 116th ST over Drainage Ditch-Relief carry?
About 6,500 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is S 116th ST over Drainage Ditch-Relief?
The structure is 175 ft (53.3 m) long with a longest span of 170 ft (51.8 m) and a deck 39 ft wide.
Who owns S 116th ST over Drainage Ditch-Relief?
It is owned by the City or Municipal Highway Agency.