Northup Way over Eastside Rail Corridor
FairKing County, Washington · Northup & 116th · Structure no. 085689000000000
- Built
- 1987
- 38 years old, rebuilt 2017
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 63 ft
- 1 main span
- Daily traffic
- 14,250
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Northup Way over Eastside Rail Corridor is a prestressed concrete stringer/multi-beam or girder carrying Northup Way over Eastside Rail Corridor in King County, Washington. It was built in 1987 and reconstructed in 2017, so it is 38 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,250 vehicles a day, roughly 6% of them trucks, projected to reach 17,813 by 2042. The structure is 63 ft (19.2 m) long and 56 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Northup Way over Eastside Rail Corridor built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2017.
What condition is Northup Way over Eastside Rail Corridor in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Northup Way over Eastside Rail Corridor carry?
About 14,250 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Northup Way over Eastside Rail Corridor?
The structure is 63 ft (19.2 m) long with a longest span of 53 ft (16.1 m) and a deck 56 ft wide.
Who owns Northup Way over Eastside Rail Corridor?
It is owned by the City or Municipal Highway Agency.