Grady Way over UPRR & Bnrr
FairKing County, Washington · 0.1 MI E of Interurban · Structure no. 085436000000000
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 1,205 ft
- 11 main spans
- Daily traffic
- 26,000
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Grady Way over UPRR & Bnrr is a prestressed concrete continuous stringer/multi-beam or girder carrying Grady Way over UPRR & Bnrr in King County, Washington. It was built in 1986, so it is 39 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 26,000 vehicles a day, roughly 7% of them trucks, projected to reach 28,000 by 2041. The structure is 1,205 ft (367.3 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grady Way over UPRR & Bnrr built?
It was built in 1986, making it 39 years old in 2025.
What condition is Grady Way over UPRR & Bnrr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Grady Way over UPRR & Bnrr carry?
About 26,000 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Grady Way over UPRR & Bnrr?
The structure is 1,205 ft (367.3 m) long with a longest span of 120 ft (36.6 m) and a deck 61 ft wide.
Who owns Grady Way over UPRR & Bnrr?
It is owned by the City or Municipal Highway Agency.