S Boeing Access RD over Bnrr
FairKing County, Washington · 0.3 MI W of E Marginal Wy · Structure no. 080025000000000
- Built
- 1945
- 80 years old, rebuilt 2018
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 337 ft
- 3 main spans
- Daily traffic
- 32,504
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Boeing Access RD over Bnrr is a steel continuous stringer/multi-beam or girder carrying S Boeing Access RD over Bnrr in King County, Washington. It was built in 1945 and reconstructed in 2018, so it is 80 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 32,504 vehicles a day, roughly 22% of them trucks, projected to reach 44,000 by 2042. The structure is 337 ft (102.7 m) long and 82 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Boeing Access RD over Bnrr built?
It was built in 1945, making it 80 years old in 2025. It was reconstructed in 2018.
What condition is S Boeing Access RD over Bnrr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does S Boeing Access RD over Bnrr carry?
About 32,504 vehicles per day (2022 count), of which roughly 22% are trucks.
How long is S Boeing Access RD over Bnrr?
The structure is 337 ft (102.7 m) long with a longest span of 91 ft (27.7 m) and a deck 82 ft wide.
Who owns S Boeing Access RD over Bnrr?
It is owned by the City or Municipal Highway Agency.