28th to 24th Ave S over Terrain (future SR 509)
GoodKing County, Washington · 0.3 MI W of SR-99 · Structure no. 002005160000000
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 129 ft
- 1 main span
- Daily traffic
- 4,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
28th to 24th Ave S over Terrain (future SR 509) is a prestressed concrete stringer/multi-beam or girder carrying 28th to 24th Ave S over Terrain (future SR 509) in King County, Washington. It was built in 2017, so it is 8 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,000 vehicles a day, projected to reach 6,550 by 2037. The structure is 129 ft (39.3 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 28th to 24th Ave S over Terrain (future SR 509) built?
It was built in 2017, making it 8 years old in 2025.
What condition is 28th to 24th Ave S over Terrain (future SR 509) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does 28th to 24th Ave S over Terrain (future SR 509) carry?
About 4,000 vehicles per day (2017 count).
How long is 28th to 24th Ave S over Terrain (future SR 509)?
The structure is 129 ft (39.3 m) long with a longest span of 123 ft (37.5 m) and a deck 87 ft wide.
Who owns 28th to 24th Ave S over Terrain (future SR 509)?
It is owned by the State Highway Agency.