US Bridges

Harrison ST over SR 99 Tunnel Void Space

Good

King County, Washington · 6.1 N JCT SR 509 · Structure no. 0017999B0000000

Built
2018
7 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
123 ft
1 main span
Daily traffic
—
2018 count
Owner
State
State Highway Agency

About this bridge

Harrison ST over SR 99 Tunnel Void Space is a concrete stringer/multi-beam or girder carrying Harrison ST over SR 99 Tunnel Void Space in King County, Washington. It was built in 2018, so it is 7 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 123 ft (37.5 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHarrison ST
CrossesSR 99 Tunnel Void Space
Location6.1 N JCT SR 509
RouteCity Street 99
Coordinates47.62208, -122.34481
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating40 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length123 ft (37.5 m)
Longest span121 ft (36.9 m)
Deck width44 ft (13.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.7 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Harrison ST over SR 99 Tunnel Void Space built?

It was built in 2018, making it 7 years old in 2025.

What condition is Harrison ST over SR 99 Tunnel Void Space in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Harrison ST over SR 99 Tunnel Void Space carry?

No traffic count is recorded for this structure.

How long is Harrison ST over SR 99 Tunnel Void Space?

The structure is 123 ft (37.5 m) long with a longest span of 121 ft (36.9 m) and a deck 44 ft wide.

Who owns Harrison ST over SR 99 Tunnel Void Space?

It is owned by the State Highway Agency.