US Bridges

WB I-90 Ramp over Relief

Good

King County, Washington · 4.4 E JCT I-5 · Structure no. 0017217A0000000

Built
2007
18 years old
Condition
Good
inspected April 2022
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
190 ft
3 main spans
Daily traffic
434
2012 count
Owner
State
State Highway Agency

About this bridge

WB I-90 Ramp over Relief is a concrete continuous box beam or girders - multiple carrying WB I-90 Ramp over Relief in King County, Washington. It was built in 2007, so it is 18 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 434 vehicles a day, roughly 5% of them trucks, projected to reach 726 by 2036. The structure is 190 ft (57.9 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWB I-90 Ramp
CrossesRelief
Location4.4 E JCT I-5
RouteInterstate 90
Coordinates47.58675, -122.23159
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84 US tons
Inventory rating50 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length190 ft (57.9 m)
Longest span88 ft (26.8 m)
Deck width27 ft (8.1 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic434 (2012)
Projected traffic726 by 2036
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusEligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.4 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB I-90 Ramp over Relief built?

It was built in 2007, making it 18 years old in 2025.

What condition is WB I-90 Ramp over Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does WB I-90 Ramp over Relief carry?

About 434 vehicles per day (2012 count), of which roughly 5% are trucks.

How long is WB I-90 Ramp over Relief?

The structure is 190 ft (57.9 m) long with a longest span of 88 ft (26.8 m) and a deck 27 ft wide.

Who owns WB I-90 Ramp over Relief?

It is owned by the State Highway Agency.