SR 202 over Tokul Creek
GoodKing County, Washington · 2.7 E JCT SR 203 · Structure no. 0012606A0000000
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 217 ft
- 1 main span
- Daily traffic
- 9,740
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 202 over Tokul Creek is a prestressed concrete stringer/multi-beam or girder carrying SR 202 over Tokul Creek in King County, Washington. It was built in 1984, so it is 41 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,740 vehicles a day, roughly 7% of them trucks, projected to reach 13,697 by 2039. The structure is 217 ft (66.1 m) long and 39 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 202 over Tokul Creek built?
It was built in 1984, making it 41 years old in 2025.
What condition is SR 202 over Tokul Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does SR 202 over Tokul Creek carry?
About 9,740 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is SR 202 over Tokul Creek?
The structure is 217 ft (66.1 m) long with a longest span of 144 ft (43.9 m) and a deck 39 ft wide.
Who owns SR 202 over Tokul Creek?
It is owned by the State Highway Agency.