US Bridges

I-90 over 468th Ave SE

Good

King County, Washington · 4.4 E JCT SR 202 · Structure no. 0008914A0000000

Built
1971
54 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
175 ft
3 main spans
Daily traffic
18,090
2023 count
Owner
State
State Highway Agency

About this bridge

I-90 over 468th Ave SE is a prestressed concrete continuous stringer/multi-beam or girder carrying I-90 over 468th Ave SE in King County, Washington. It was built in 1971, so it is 54 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,090 vehicles a day, roughly 18% of them trucks, projected to reach 24,643 by 2039. The structure is 175 ft (53.3 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-90
Crosses468th Ave SE
Location4.4 E JCT SR 202
RouteInterstate 90
Coordinates47.46481, -121.7165
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating29.3 US tons
Inventory rating22.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length175 ft (53.3 m)
Longest span76 ft (23.2 m)
Deck width54 ft (16.6 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,090 (2023)
Projected traffic24,643 by 2039
Trucks18%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$4.5 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-90 over 468th Ave SE built?

It was built in 1971, making it 54 years old in 2025.

What condition is I-90 over 468th Ave SE in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-90 over 468th Ave SE carry?

About 18,090 vehicles per day (2023 count), of which roughly 18% are trucks.

How long is I-90 over 468th Ave SE?

The structure is 175 ft (53.3 m) long with a longest span of 76 ft (23.2 m) and a deck 54 ft wide.

Who owns I-90 over 468th Ave SE?

It is owned by the State Highway Agency.