SR 509 over Thames Creek/Ped Trail
FairKing County, Washington · 11.0 N JCT I-705 · Structure no. 000000HX0000000
- Built
- 1929
- 96 years old, rebuilt 1996
- Condition
- Fair
- inspected July 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 557 ft
- 11 main spans
- Daily traffic
- 3,869
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 509 over Thames Creek/Ped Trail is a steel girder and floorbeam system carrying SR 509 over Thames Creek/Ped Trail in King County, Washington. It was built in 1929 and reconstructed in 1996, so it is 96 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,869 vehicles a day, roughly 3% of them trucks, projected to reach 5,683 by 2039. The structure is 557 ft (169.8 m) long and 35 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 509 over Thames Creek/Ped Trail built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 1996.
What condition is SR 509 over Thames Creek/Ped Trail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does SR 509 over Thames Creek/Ped Trail carry?
About 3,869 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is SR 509 over Thames Creek/Ped Trail?
The structure is 557 ft (169.8 m) long with a longest span of 72 ft (21.9 m) and a deck 35 ft wide.
Who owns SR 509 over Thames Creek/Ped Trail?
It is owned by the State Highway Agency.