SR 513 over Montlake Cut
FairPosted for loadKing County, Washington · 0.2 N JCT SR 520 · Structure no. 000000HH0000000
- Built
- 1924
- 101 years old, rebuilt 2021
- Condition
- Fair
- inspected April 2024
- Type
- Movable - Bascule
- Steel
- Length
- 344 ft
- 1 main span
- Daily traffic
- 55,497
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 513 over Montlake Cut is a steel movable - bascule carrying SR 513 over Montlake Cut in King County, Washington. It was built in 1924 and reconstructed in 2021, so it is 101 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 55,497 vehicles a day, roughly 3% of them trucks, projected to reach 92,762 by 2039. The structure is 344 ft (104.9 m) long and 60 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 513 over Montlake Cut built?
It was built in 1924, making it 101 years old in 2025. It was reconstructed in 2021.
What condition is SR 513 over Montlake Cut in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does SR 513 over Montlake Cut carry?
About 55,497 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is SR 513 over Montlake Cut?
The structure is 344 ft (104.9 m) long with a longest span of 156 ft (47.5 m) and a deck 60 ft wide.
Who owns SR 513 over Montlake Cut?
It is owned by the State Highway Agency.