US Bridges

Park Road over Footbridge Trail

Good

Jefferson County, Washington · 0.5 MI West of US 101 · Structure no. 002005480000000

Built
2023
2 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
45 ft
1 main span
Daily traffic
75
2020 count
Owner
State
State Park, Forest, or Reservation Agency

About this bridge

Park Road over Footbridge Trail is a steel stringer/multi-beam or girder carrying Park Road over Footbridge Trail in Jefferson County, Washington. It was built in 2023, so it is 2 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, projected to reach 78 by 2040. The structure is 45 ft (13.7 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPark Road
CrossesFootbridge Trail
Location0.5 MI West of US 101
RouteState Lands Road 101
Coordinates47.68796, -122.90266
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating72.5 US tons
Inventory rating55.7 US tons

Structure

MaterialSteel
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length45 ft (13.7 m)
Longest span38 ft (11.6 m)
Deck width31 ft (9.4 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2020)
Projected traffic78 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Park, Forest, or Reservation Agency
Maintained byState Park, Forest, or Reservation Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Park Road over Footbridge Trail built?

It was built in 2023, making it 2 years old in 2025.

What condition is Park Road over Footbridge Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Park Road over Footbridge Trail carry?

About 75 vehicles per day (2020 count).

How long is Park Road over Footbridge Trail?

The structure is 45 ft (13.7 m) long with a longest span of 38 ft (11.6 m) and a deck 31 ft wide.

Who owns Park Road over Footbridge Trail?

It is owned by the State Park, Forest, or Reservation Agency.