US Bridges

Krug Road over E L 85 M 5

Good

Franklin County, Washington · 0.31 S. Coyan 200 · Structure no. 086251000000000

Built
1996
29 years old
Condition
Good
inspected November 2022
Type
Tee Beam
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
77
2022 count
Owner
County
County Highway Agency

About this bridge

Krug Road over E L 85 M 5 is a prestressed concrete tee beam carrying Krug Road over E L 85 M 5 in Franklin County, Washington. It was built in 1996, so it is 29 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 77 vehicles a day, roughly 75% of them trucks, projected to reach 114 by 2042. The structure is 50 ft (15.2 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesKrug Road
CrossesE L 85 M 5
Location0.31 S. Coyan 200
RouteCounty Highway 2170
Coordinates46.71737, -118.98473
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32.2 US tons
Inventory rating17.9 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length50 ft (15.2 m)
Longest span50 ft (15.2 m)
Deck width28 ft (8.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic77 (2022)
Projected traffic114 by 2042
Trucks75%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Krug Road over E L 85 M 5 built?

It was built in 1996, making it 29 years old in 2025.

What condition is Krug Road over E L 85 M 5 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does Krug Road over E L 85 M 5 carry?

About 77 vehicles per day (2022 count), of which roughly 75% are trucks.

How long is Krug Road over E L 85 M 5?

The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.

Who owns Krug Road over E L 85 M 5?

It is owned by the County Highway Agency.