Gold Creek RD over West Fork Sanpoil River
FairPosted for loadFerry County, Washington · 2.5 W SR 21 · Structure no. 089025000000000
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 51 ft
- 2 main spans
- Daily traffic
- 18
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Gold Creek RD over West Fork Sanpoil River is a concrete stringer/multi-beam or girder carrying Gold Creek RD over West Fork Sanpoil River in Ferry County, Washington. It was built in 1962, so it is 63 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 18 vehicles a day, roughly 20% of them trucks, projected to reach 27 by 2040. The structure is 51 ft (15.5 m) long and 27 ft wide. If it were closed, the detour would be 37.3 mi (60 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gold Creek RD over West Fork Sanpoil River built?
It was built in 1962, making it 63 years old in 2025.
What condition is Gold Creek RD over West Fork Sanpoil River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Gold Creek RD over West Fork Sanpoil River carry?
About 18 vehicles per day (2018 count), of which roughly 20% are trucks.
How long is Gold Creek RD over West Fork Sanpoil River?
The structure is 51 ft (15.5 m) long with a longest span of 25 ft (7.6 m) and a deck 27 ft wide.
Who owns Gold Creek RD over West Fork Sanpoil River?
It is owned by the County Highway Agency.