Division Street over Crown Z Mill Water Canal
FairPosted for loadClark County, Washington · 0.15 N JCT NW 6AVE · Structure no. 085153000000000
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 2,518
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Division Street over Crown Z Mill Water Canal is a prestressed concrete stringer/multi-beam or girder carrying Division Street over Crown Z Mill Water Canal in Clark County, Washington. It was built in 1960, so it is 65 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,518 vehicles a day, roughly 5% of them trucks, projected to reach 7,401 by 2039. The structure is 30 ft (9.1 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Division Street over Crown Z Mill Water Canal built?
It was built in 1960, making it 65 years old in 2025.
What condition is Division Street over Crown Z Mill Water Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Division Street over Crown Z Mill Water Canal carry?
About 2,518 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Division Street over Crown Z Mill Water Canal?
The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 36 ft wide.
Who owns Division Street over Crown Z Mill Water Canal?
It is owned by the City or Municipal Highway Agency.