Fruit Valley Road over Bn RR Main Line
FairPosted for loadClark County, Washington · 2.16 N SR 501@BNRR · Structure no. 085124000000000
- Built
- 1948
- 77 years old
- Condition
- Fair
- inspected March 2023
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 303 ft
- 3 main spans
- Daily traffic
- 8,491
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Fruit Valley Road over Bn RR Main Line is a steel continuous girder and floorbeam system carrying Fruit Valley Road over Bn RR Main Line in Clark County, Washington. It was built in 1948, so it is 77 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 8,491 vehicles a day, roughly 8% of them trucks, projected to reach 21,022 by 2039. The structure is 303 ft (92.4 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fruit Valley Road over Bn RR Main Line built?
It was built in 1948, making it 77 years old in 2025.
What condition is Fruit Valley Road over Bn RR Main Line in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Fruit Valley Road over Bn RR Main Line carry?
About 8,491 vehicles per day (2017 count), of which roughly 8% are trucks.
How long is Fruit Valley Road over Bn RR Main Line?
The structure is 303 ft (92.4 m) long with a longest span of 105 ft (32 m) and a deck 35 ft wide.
Who owns Fruit Valley Road over Bn RR Main Line?
It is owned by the City or Municipal Highway Agency.