US Bridges

N-N Ramp over I-205 SB

Good

Clark County, Washington · 6.2 N JCT SR 500 · Structure no. 0018311B0000000

Built
2014
11 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
315 ft
3 main spans
Daily traffic
7,032
2023 count
Owner
State
State Highway Agency

About this bridge

N-N Ramp over I-205 SB is a prestressed concrete continuous stringer/multi-beam or girder carrying N-N Ramp over I-205 SB in Clark County, Washington. It was built in 2014, so it is 11 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,032 vehicles a day, roughly 5% of them trucks, projected to reach 10,014 by 2039. The structure is 315 ft (96 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN-N Ramp
CrossesI-205 SB
Location6.2 N JCT SR 500
RouteInterstate 5
Coordinates45.72075, -122.65397
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating41.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length315 ft (96 m)
Longest span150 ft (45.7 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,032 (2023)
Projected traffic10,014 by 2039
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$4.8 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was N-N Ramp over I-205 SB built?

It was built in 2014, making it 11 years old in 2025.

What condition is N-N Ramp over I-205 SB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does N-N Ramp over I-205 SB carry?

About 7,032 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is N-N Ramp over I-205 SB?

The structure is 315 ft (96 m) long with a longest span of 150 ft (45.7 m) and a deck 43 ft wide.

Who owns N-N Ramp over I-205 SB?

It is owned by the State Highway Agency.