US Bridges

SR 112 over Joe Creek

Good

Clallam County, Washington · 10.1 E JCT SR 113 · Structure no. 0018874A0000000

Built
2016
9 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
21 ft
1 main span
Daily traffic
835
2023 count
Owner
State
State Highway Agency

About this bridge

SR 112 over Joe Creek is a concrete culvert carrying SR 112 over Joe Creek in Clallam County, Washington. It was built in 2016, so it is 9 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 835 vehicles a day, roughly 16% of them trucks, projected to reach 1,061 by 2039. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 9.9 mi (16 km).

CarriesSR 112
CrossesJoe Creek
Location10.1 E JCT SR 113
RouteState Highway 112
Coordinates48.17403, -124.05558
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating106.8 US tons
Inventory rating106.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length21 ft (6.4 m)
Longest span21 ft (6.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic835 (2023)
Projected traffic1,061 by 2039
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.1 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 112 over Joe Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is SR 112 over Joe Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SR 112 over Joe Creek carry?

About 835 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is SR 112 over Joe Creek?

The structure is 21 ft (6.4 m) long with a longest span of 21 ft (6.4 m).

Who owns SR 112 over Joe Creek?

It is owned by the State Highway Agency.