US 2 over Nason Creek
PoorChelan County, Washington · 7.7 E King CO · Structure no. 0013281A0000000
- Built
- 1987
- 38 years old
- Condition
- Poor
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 176 ft
- 2 main spans
- Daily traffic
- 5,262
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 2 over Nason Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying US 2 over Nason Creek in Chelan County, Washington. It was built in 1987, so it is 38 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 5,262 vehicles a day, roughly 5% of them trucks, projected to reach 6,086 by 2039. The structure is 176 ft (53.6 m) long and 43 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 2 over Nason Creek built?
It was built in 1987, making it 38 years old in 2025.
What condition is US 2 over Nason Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does US 2 over Nason Creek carry?
About 5,262 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is US 2 over Nason Creek?
The structure is 176 ft (53.6 m) long with a longest span of 84 ft (25.6 m) and a deck 43 ft wide.
Who owns US 2 over Nason Creek?
It is owned by the State Highway Agency.