SR 207 over Wenatchee River
PoorChelan County, Washington · 4.2 N JCT US 2 · Structure no. 0002657A0000000
- Built
- 1940
- 85 years old
- Condition
- Poor
- inspected April 2023
- Type
- Truss - Thru
- Steel
- Length
- 216 ft
- 1 main span
- Daily traffic
- 1,805
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 207 over Wenatchee River is a steel truss - thru carrying SR 207 over Wenatchee River in Chelan County, Washington. It was built in 1940, so it is 85 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,805 vehicles a day, roughly 13% of them trucks, projected to reach 1,853 by 2039. The structure is 216 ft (65.8 m) long and 25 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 207 over Wenatchee River built?
It was built in 1940, making it 85 years old in 2025.
What condition is SR 207 over Wenatchee River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2023.
How much traffic does SR 207 over Wenatchee River carry?
About 1,805 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is SR 207 over Wenatchee River?
The structure is 216 ft (65.8 m) long with a longest span of 160 ft (48.8 m) and a deck 25 ft wide.
Who owns SR 207 over Wenatchee River?
It is owned by the State Highway Agency.