US Bridges

Bombing Range Road over Cid Canal

Good

Benton County, Washington · JCT SR224 · Structure no. 087052000000000

Built
1990
35 years old, rebuilt 2020
Condition
Good
inspected November 2023
Type
Slab
Concrete
Length
28 ft
1 main span
Daily traffic
10,108
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Bombing Range Road over Cid Canal is a concrete slab carrying Bombing Range Road over Cid Canal in Benton County, Washington. It was built in 1990 and reconstructed in 2020, so it is 35 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,108 vehicles a day, roughly 8% of them trucks, projected to reach 14,895 by 2038. The structure is 28 ft (8.5 m) long and 70 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBombing Range Road
CrossesCid Canal
LocationJCT SR224
RouteCity Street 1425
Coordinates46.30022, -119.34734
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.2 US tons
Inventory rating44.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span26 ft (7.9 m)
Deck width70 ft (21.2 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,108 (2017)
Projected traffic14,895 by 2038
Trucks8%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedDeck rehabilitation with only incidental widening
Estimated improvement cost$798,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Bombing Range Road over Cid Canal built?

It was built in 1990, making it 35 years old in 2025. It was reconstructed in 2020.

What condition is Bombing Range Road over Cid Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Bombing Range Road over Cid Canal carry?

About 10,108 vehicles per day (2017 count), of which roughly 8% are trucks.

How long is Bombing Range Road over Cid Canal?

The structure is 28 ft (8.5 m) long with a longest span of 26 ft (7.9 m) and a deck 70 ft wide.

Who owns Bombing Range Road over Cid Canal?

It is owned by the City or Municipal Highway Agency.