C.C.B. over C.I.D. Canal
FairPosted for loadBenton County, Washington · 00.1 S SR240 · Structure no. 085499000000000
- Built
- 1970
- 55 years old, rebuilt 1999
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 36,358
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
C.C.B. over C.I.D. Canal is a concrete stringer/multi-beam or girder carrying C.C.B. over C.I.D. Canal in Benton County, Washington. It was built in 1970 and reconstructed in 1999, so it is 55 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 36,358 vehicles a day, roughly 10% of them trucks, projected to reach 58,172 by 2041. The structure is 52 ft (15.8 m) long and 114 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C.C.B. over C.I.D. Canal built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1999.
What condition is C.C.B. over C.I.D. Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does C.C.B. over C.I.D. Canal carry?
About 36,358 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is C.C.B. over C.I.D. Canal?
The structure is 52 ft (15.8 m) long with a longest span of 34 ft (10.4 m) and a deck 114 ft wide.
Who owns C.C.B. over C.I.D. Canal?
It is owned by the City or Municipal Highway Agency.