District Line Road over Chandler Canal
FairPosted for loadBenton County, Washington · 00.126 NW of Oieh · Structure no. 081567000000000
- Built
- 1953
- 72 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 52 ft
- 1 main span
- Daily traffic
- 404
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
District Line Road over Chandler Canal is a wood or timber stringer/multi-beam or girder carrying District Line Road over Chandler Canal in Benton County, Washington. It was built in 1953, so it is 72 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 404 vehicles a day, roughly 15% of them trucks, projected to reach 400 by 2040. The structure is 52 ft (15.8 m) long and 24 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was District Line Road over Chandler Canal built?
It was built in 1953, making it 72 years old in 2025.
What condition is District Line Road over Chandler Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does District Line Road over Chandler Canal carry?
About 404 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is District Line Road over Chandler Canal?
The structure is 52 ft (15.8 m) long with a longest span of 52 ft (15.8 m) and a deck 24 ft wide.
Who owns District Line Road over Chandler Canal?
It is owned by the County Highway Agency.