US Bridges

I-82 over Coffin Road

Good

Benton County, Washington · 9.9 E JCT US 395 · Structure no. 0012303B0000000

Built
1983
42 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
134 ft
1 main span
Daily traffic
11,119
2023 count
Owner
State
State Highway Agency

About this bridge

I-82 over Coffin Road is a prestressed concrete stringer/multi-beam or girder carrying I-82 over Coffin Road in Benton County, Washington. It was built in 1983, so it is 42 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,119 vehicles a day, roughly 22% of them trucks, projected to reach 12,929 by 2039. The structure is 134 ft (40.8 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-82
CrossesCoffin Road
Location9.9 E JCT US 395
RouteInterstate 82
Coordinates46.02557, -119.22467
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating53 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length134 ft (40.8 m)
Longest span129 ft (39.4 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,119 (2023)
Projected traffic12,929 by 2039
Trucks22%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.5 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-82 over Coffin Road built?

It was built in 1983, making it 42 years old in 2025.

What condition is I-82 over Coffin Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does I-82 over Coffin Road carry?

About 11,119 vehicles per day (2023 count), of which roughly 22% are trucks.

How long is I-82 over Coffin Road?

The structure is 134 ft (40.8 m) long with a longest span of 129 ft (39.4 m) and a deck 41 ft wide.

Who owns I-82 over Coffin Road?

It is owned by the State Highway Agency.