Deal RD over Farrier Coulee
GoodAdams County, Washington · 00.22 MI N Koch RD · Structure no. 084730000000000
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 133
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Deal RD over Farrier Coulee is a prestressed concrete stringer/multi-beam or girder carrying Deal RD over Farrier Coulee in Adams County, Washington. It was built in 1989, so it is 36 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 133 vehicles a day, roughly 9% of them trucks, projected to reach 166 by 2039. The structure is 60 ft (18.3 m) long and 30 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Deal RD over Farrier Coulee built?
It was built in 1989, making it 36 years old in 2025.
What condition is Deal RD over Farrier Coulee in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Deal RD over Farrier Coulee carry?
About 133 vehicles per day (2018 count), of which roughly 9% are trucks.
How long is Deal RD over Farrier Coulee?
The structure is 60 ft (18.3 m) long with a longest span of 59 ft (18 m) and a deck 30 ft wide.
Who owns Deal RD over Farrier Coulee?
It is owned by the County Highway Agency.